Precast beam with an in-situ topping to EN 1992-1-1
A precast beam first carries the wet topping on its own, then works together with the hardened topping. Here a 300 × 400 mm precast beam with a 1000 × 100 mm topping is worked by hand: the bending resistance of each stage and the shear across the joint, to EN 1992-1-1. The hand calculation is checked against the STATIX composite precast beam calculator.
1. The problem
| Input | Value |
|---|---|
| Precast beam b × h | 300 × 400 mm, f_ck = 40 MPa |
| Topping b_t × h_t | 1000 × 100 mm (the width acting with the beam), f_ck = 30 MPa |
| Bottom bars | 5 Y25 at 50 mm above the soffit, f_yk = 500 MPa |
| Moments (ULS) | stage 1, precast alone: M_1,Ed = 80 kNm; total on the composite: M_Ed = 250 kNm |
| Shear at the joint | V_Ed = 150 kN |
| Joint | rough surface, links crossing A_si = 1000 mm²/m at 90°, joint width b_i = b, σ_n = 0 |
| Concrete factor | α_cc = 0.85 |
| Shear links | Y8, 2 legs at 200 mm (the calculator's default; for the member shear) |
2. The method EN 1992-1-1 6.1, 3.1.7(3)
A precast beam carries the wet topping and the construction load on its own (stage 1). Once the topping hardens, the two act together (stage 2). At the ultimate limit state the order of loading does not change the plastic resistance, so stage 1 checks the stage 1 moment on the precast alone and stage 2 checks the TOTAL moment on the composite section. Each resistance uses the rectangular block of 0.8 x at fcd with εcu3 = 0.0035 at the top (3.1.7(3)), and the bars at fyd once they yield. The joint between the precast and the topping must carry the shear flow (6.2.5).
3. Materials and the bars EN 1992-1-1 3.1.6, 3.2.7
αcc = 0.85 is the calculator's default (the EN recommended value; the SANS 51992 annex uses 1.0). γc = 1.5, γs = 1.15.
4. Stage 1: the precast alone EN 1992-1-1 6.1, 3.1.7(3)
The block of depth 0.8 x and width b balances the bar force. Then check that the bars really yield: the strain at the bars must be at least εyd.
5. Stage 2: the composite section EN 1992-1-1 6.1, 3.1.7(3)
Now the compression is in the 1000 mm wide topping, at the topping's fcd. If the block 0.8 x is no deeper than the topping, all of it is in the topping concrete and the share of the compression in the topping is β = 1.0. The bars are 100 mm deeper than in stage 1.
6. Interface shear: the stress EN 1992-1-1 6.2.5, eq. 6.24
The shear flow across the joint is the change in the topping compression along the beam. Per unit area of the joint it is vEdi = β VEd / (z bi), with z the composite lever arm from stage 2 and bi the joint width, here the precast width (the calculator's default when bi is blank).
7. Interface shear: the resistance EN 1992-1-1 6.2.5, eq. 6.25, 6.2.5(2), 6.6N
The joint resists by adhesion (c), friction (μ) and the links that cross it. For a rough surface c = 0.40 and μ = 0.7 (6.2.5(2)). There is no normal stress across the joint (σn = 0). The links are 1000 mm² per metre of joint, at α = 90°. The calculator takes fctd and fcd of the weaker concrete, the C30 topping: the safe side, since the code does not say which. αct = 1.0.
8. The calculator's answer
The calculator, with the same inputs, gives MRd = 289.8 kNm for stage 1 and 446.7 kNm for the composite section, vEdi = 1.194 MPa against vRdi = 1.555 MPa (engine 1.3.0), and PASS. The hand calculation gives the same numbers. The calculator also checks the staged service stresses of EN 1992-1-1 7.2 (from M1,k = 55 kNm and M2,k = 110 kNm, its other defaults): precast top 8.76 MPa, topping top 5.19 MPa, steel 181.6 MPa, all within their limits, and the member shear of the precast web at the composite depth (EN 1992-1-1 6.2.3) with Y8 links, 2 legs at 200 mm: 69 % used. They are not worked here. Change the surface to smooth, or remove the links, and watch the interface check.
Open the composite precast beam calculator
A worked example for learning, not a design. Check every value against the current code and your own project, and have the design checked and signed by a registered professional engineer.
Be first to use STATIX 3D.
STATIX 3D is still being built. Join the early-access list and we will tell you when it is ready for testing. One confirmation now, one message then.