A steel sheet pile wall retains 4 m of sand with no anchor or prop. Here Blum's simplified method gives the embedment depth and the largest bending moment by hand, with the EN 1997-1 Design Approach 1 factors. The hand calculation is checked against the STATIX cantilever sheet pile calculator.

1. The problem

InputValue
Wallcantilever steel sheet pile, retained height H = 4 m
Soilone granular soil, dry or moist: φ′ = 32°, γ = 18 kN/m³
Surchargeq = 10 kPa on the retained side (variable)
SectionW_el = 1 300 cm³/m, f_y = 355 MPa
Toe extensionD = 1.2 D0 (Blum, practice value)
Waternone (not covered by this check)

2. The method Blum (fixed-earth method), Rankine pressures

A cantilever wall is held only by the soil in front of it, below the dredge line. Blum's simplified method lets the wall rotate about a point O near the toe: above O the soil behind pushes with active pressure, the soil in front resists with passive pressure. The small counter-force below O is left out, and the wall is made 20 % longer below the dredge line to give room for it. The pressures are Rankine's, with no wall friction (the safe side).

K_a = (1 − sin φ′) / (1 + sin φ′), K_p = 1 / K_a moments about O: K_p γ D0³ / 6 = K_a γ (H + D0)³ / 6 + K_a q (H + D0)² / 2

3. Design values to EN 1997-1 EN 1997-1 2.4.7.3.4; Annex A, DA1 Combination 2

The embedment is sized with Design Approach 1, Combination 2: tan φ′ is divided by the M2 factor 1.25, and the variable surcharge is multiplied by the A2 factor 1.3. The lower φ′ makes the active pressure larger and the passive pressure smaller.

φ′_d = atan(tan 32° / 1.25) = atan(0.6249 / 1.25) = 26.56° K_a,d = (1 − sin 26.56°) / (1 + sin 26.56°) = 0.3820, K_p,d = 1 / 0.3820 = 2.6175 q_d = 1.3 × 10 = 13.0 kPa (characteristic, for comparison: K_a = 0.3073, K_p = 3.2546)

4. Depth to the rotation point O Blum; EN 1997-1 9.7

The moment of the passive block about O must balance the moment of the active pressure (soil and surcharge) about O. That is a cubic in D0. By hand, try depths until the two sides match; the last digits come from a few more trials (or Newton's method). Passive moment vs active moment, with the design values:

D0 = 5.000 m: 2.6175 × 18 × 5.000³ / 6 = 981.6 vs 0.3820 × 18 × 9.000³ / 6 + 0.3820 × 13 × 9.000² / 2 = 1036.7 → −55.1 kNm/m D0 = 5.500 m: 2.6175 × 18 × 5.500³ / 6 = 1306.5 vs 0.3820 × 18 × 9.500³ / 6 + 0.3820 × 13 × 9.500² / 2 = 1206.8 → 99.7 kNm/m D0 = 5.195 m: 2.6175 × 18 × 5.195³ / 6 = 1101.0 vs 0.3820 × 18 × 9.195³ / 6 + 0.3820 × 13 × 9.195² / 2 = 1101.0 → 0.0 kNm/m D0,d = 5.195 m (the two sides match)

5. Embedment depth Blum; practice value

The counter-force below O is not in the sums, so the wall goes deeper than O. Blum's usual allowance is 20 %: D = 1.2 D0. The factor 1.2 is a practice value from Blum's method, not a code number.

D = 1.2 × 5.195 = 6.234 m, round up: D = 6.24 m below the dredge line pile length = H + D = 4 + 6.24 = 10.24 m (characteristic soil, for comparison: D0 = 3.779 m, D = 4.535 m)
q = 10 kPaactive, K_a,d68.2 kPa at Opassive, K_p,d244.8 kPa at Odredge lineH = 4 mM max, z = 2.90 mO, D0 = 5.20 mtoe, D = 6.24 m

6. Maximum bending moment Blum; EN 1997-1 DA1 C2

The largest moment in the wall is where the shear is zero: at a depth z below the dredge line where the passive force equals the active force. That is a quadratic in z. The moment there is the active moment minus the passive moment, both taken about that point.

K_p γ z² / 2 = K_a γ (H + z)² / 2 + K_a q (H + z) (K_p − K_a) γ z² / 2 − K_a (γ H + q) z − K_a (γ H² / 2 + q H) = 0 (2.6175 − 0.3820) × 18 / 2 = 20.1196, 0.3820 × (18 × 4 + 13) = 32.4732, 0.3820 × (18 × 4² / 2 + 13 × 4) = 74.8793 20.1196 z² − 32.4732 z − 74.8793 = 0 (design values) z = (32.4732 + √(32.4732² + 4 × 20.1196 × 74.8793)) / (2 × 20.1196) z = 2.898 m below the dredge line M = K_a γ (H + z)³ / 6 + K_a q (H + z)² / 2 − K_p γ z³ / 6 = 0.3820 × 18 × 6.898³ / 6 + 0.3820 × 13 × 6.898² / 2 − 2.6175 × 18 × 2.898³ / 6 = 376.21 + 118.16 − 191.16 = 303.22 kNm/m

7. The other combination EN 1997-1 2.4.7.3.2(2); DA1 Combination 1

For the bending of the wall, Design Approach 1 also asks for Combination 1: characteristic soil strength, the effects factored. The calculator works the same moment with q × 1.5 / 1.35 and multiplies it by 1.35 (that is 1.35 on the soil pressure and 1.5 on the surcharge pressure). The larger of the two governs.

characteristic K_a = 0.3073, K_p = 3.2546, q = 1.5 × 10 / 1.35 = 11.111 kPa zero shear at z = 2.035 m, M = 182.50 kNm/m, × 1.35 = 246.37 kNm/m M_Ed = max(303.22, 246.37) = 303.22 kNm/m (Combination 2 governs)

8. Bending resistance of the pile EN 1993-5 5.2.2

The steel sheet pile is checked elastically: Wel fy / γM0 with γM0 = 1.0. That is on the safe side for a class 1 or 2 section.

M_Rd = 1 300 × 355 / 1000 = 461.5 kNm/m M_Ed = 303.2 kNm/m ≤ 461.5 kNm/m OK, utilisation 66 %

9. The calculator's answer

The calculator, with the same inputs, gives D = 6.24 m and MEd = 303.3 kNm/m (engine 1.1.0; it rounds an embedment and a moment up, never short) and PASS. The hand calculation gives the same. Water is not in this method: a water level difference behind the wall needs its own check. Try φ′ = 30° in the calculator and see how much deeper the wall goes.

hand: D0,d = 5.195 m, D = 6.234 m, M_Ed = 303.22 kNm/m calculator: D0,d = 5.195 m, D = 6.234 m, M_Ed = 303.22 kNm/m (PASS)
Run this example yourselfOpen the STATIX cantilever sheet pile calculator. These are the calculator's default inputs, so it opens on this example. Change any value and the result updates, with every check and a calc sheet.
Open the cantilever sheet pile calculator

A worked example for learning, not a design. Check every value against the current code and your own project, and have the design checked and signed by a registered professional engineer.

Early access

Be first to use STATIX 3D.

STATIX 3D is still being built. Join the early-access list and we will tell you when it is ready for testing. One confirmation now, one message then.

Get early access