Pipe Culvert Calculator (SANS 677, TMH7)
A precast concrete pipe culvert under a road: the TMH7 earth and traffic loads on the pipe, against the SANS 677 class. The bedding check needs SANS 10102-2, which is not available, so the page reads NOT CHECKED and assumes no bedding factor. A check that rests on a value the page assumed reads REVIEW, not PASS, until you give that value.
Pipe SANS 677
mm
mm
m
Loads TMH7 Part 2
m
TMH7 traffic cases
m
Soil the installation sets the earth load
kg/m³
m
Step-by-step calculation
Loading the calc sheet from the STATIX server… Start your free 14-day trial for every check and the calc sheet.